CUD has a planned water service outage that will take place on Wednesday May 24,  from 8:00 AM until approx. 4:00 PM.  The outage area will affect customers living in both Oakland Farms (Coldstream Rd.) and Burns Place Subdivisions.   The work planned during this outage is a cut and cap type construction project allowing CUD to fully implement the new 16 ” line on Manchester Hwy.

Please remember that unexpected issues can arise with work of this nature. There is always the potential of other streets in the surrounding area being affected.

Thank you for your patience and understanding during both planned and unexpected outages.

Rates

General Usage Rates Effective October 1, 2012

Water Rates

Water Usage per thousand gallons for residential meters up to 1 Inch:

Minimum Bill (0 – 500 gals.) $12.78
500 – 5,000 $6.29 (per thousand gallons)
5,000 – 10,000 $6.79 (per thousand gallons)
10,000 – 20,000 $7.29 (per thousand gallons)
20,000 – 100,000 $7.79 (per thousand gallons)
Over 100,000 $6.79 (per thousand gallons)

Minimum Bill Charge for Larger Meters*:

Size Gallons Minimum Bill
1 1/2 Inch 0-1,000 $25.56
2 Inch 0-1,000 $25.56
3 Inch 0-1,500 $38.34
4 Inch 0-2,000 $51.12
6 Inch 0-3,000 $76.68
8 Inch 0-4,000 $102.24

*Contact CUD for additional information on rate structure for larger meters.

________________________________________________

Sewer Rates

CUD STEP System:  Flat rate: $28.00 per month plus $2.00 per thousand gallons of all consumption

Note:  Murfreesboro Water & Sewer, City of Eagleville, and Smyrna Utility rates are set by those entities.

Other Fees

Fee Schedule

 (Effective September 1, 2009):

Service Connect Fee (unlock) $50.00
Connect Fee (Read & Leave On) $50.00
Transfer Fee $40.00
Disconnect Fee for Nonpayment $50.00
Overtime Fee $100.00

________________________________________________

System Development Charges by Meter Size – Residential/Irrigation

5/8 Inch $2,800.00
3/4 Inch $2,800.00
1 Inch (Fire Sprinkler System) $2,800.00
1 Inch $7,000.00
2 Inch $22,400.00

System Development Charges – Commercial, Industrial, and Multi-Family Residential

System Development Charges (tap fees) for all commercial, industrial, and multi-family residential properties are determined by fixture units.  Please fill out the required Meter Application and Fixture Count Submittal Form below. Instructions for application submittal are located at the top of the form.

Meter Application Form

________________________________________________

Fire Hydrants

If you are interested in a fire hydrant, please fill out the Fire Hydrant Application Form.  All costs are located at the bottom of the form.  Instructions for submittal are located at the top of the form.