Fees
Review Activities |
FEES |
||
Flat |
Per Lot |
||
Commercial Site Plan Review ** |
$700 |
|
|
Commercial Meter Application Review |
$300 |
|
|
Water Service Availability Request * |
$200 |
|
|
Preliminary Plats & Construction Plans (single-family) – Water Review ** |
|
$10 |
|
Preliminary Plats & Construction Plans (townhomes individually metered) – Water Review ** |
|
$30 |
|
Move Tap Plan Review Fee |
|
$250 |
|
†MINOR Revisions to Completed Water &/or STEP Collection Plans * |
$500 |
|
|
STEP Preliminary Review of Master Plan (Intent to Serve) * |
$300 |
|
|
Preliminary Plats & Construction Plans – STEP Collection & Treatment Review ** |
|
$100 |
|
Preliminary Plats & Construction Plans – STEP Collection ONLY Review ** |
|
$50 |
|
Final Plat Review ** |
$400 |
|
|
* Per Submittal ** This covers the first 4 submittals & each additional submittal is at half the cost/lot. †MINOR Revisions… involves changes to the scope of a section or phase within the same Master Plan. It does not involve changes to the configuration of the streets. |
|||
Design Activities |
FEES |
||
Flat |
Per Lot |
||
Commercial Site – Water |
*** |
|
|
Residential Subdivision – Water |
|
$45 |
|
*** Per quote from James C. Hailey Company for each site. |
|||
Inspection Activities |
FEES |
||
Flat |
Per Lot |
||
Residential Subdivision – Water Distribution On-Site |
|
$160 |
|
Residential Subdivision – STEP Collection |
|
$100 |
|
Residential Subdivision – STEP Tank & Plot Plan |
|
$500 |
|
|
Other Fee Basis |
||
Commercial Site (Per water meter vault requiring inspection) |
$700 |
||
Residential Subdivision – Water Distribution Off-Site AND Commercial Site (Per 100′ of water main installed after the first 100’; 101’ – 200’ = $50; 201’ – 300’ = $100; 301’ – 400’ = $150, etc.) |
$50 |
||
Residential Subdivision – STEP Treatment (Per 1,000 GPD Treatment Capacity) |
$250 |
||
Tap Fee
CUD performs all water taps on our water mains. No contractor is allowed to perform a tap on a main without consent from CUD. Depending on the size and material of the main being tapped and the size of the tap itself, the Contractor/Developer may be required to install the tapping sleeve/tee, tapping valve and perform a hydrostatic test per CUD’s specifications prior to CUD performing the tap. The rates are:
Meter Set Fee
Meter Set Fee (5/8” – 2” meters): In addition to the System Development Charge (SDC) and a tap fee, each customer is required to pay the cost for labor and material to establish service to the customer. CUD will provide all domestic and irrigation meters 2” and smaller included in the fees below:
Large Meter: 3” and Larger
All meters 3” and larger including combination meters, used for domestic, irrigation and/or fire protection will be the responsibility of the contractor/owner to purchase per an approved meter application. CUD will provide a list of approved meters for the specific application that meet our meter specifications. Meter size and type will be determined at CUD’s sole discretion.
NOTE: If a 1.5” – 2” fire meter is required, the contractor/developer will be responsible to purchase the meter per an approved meter application based on the list supplied by CUD.